
💢LOKO OWETO BRIDGE VS THE SECOND NIGER BRIDGE ..
This is the 2.2km Loko-Oweto Bridge that connects Benue to Nassarawa (Both State in the North Central)…
It was done and dusted without any noise and fanfare… it is also not tolled.
The Construction of this Bridge started in 2011 and was completed and delivered in 2020. This Bridge is not in any form or manner tolled .
This Bridge is way longer than the Second Niger Bridge that connects the south west and south south to the south east.
I never saw any news in the media asking the indigenes of Benue and Nassarawa state to carry gay cows and atilogwu dance to go and thank Goodluck Jonathan and Buhari.
But, everyday human beings with grey matter in their cranium (abi is it pig pooh pooh?), will always remind us to dobale before Buhari for allowing the continuation of work on the 1.6km Second Niger Bridge that will be tolled and levied …
The FGN and her private sector partners, who funded the construction of this Second Niger Bridge at an outrageously overinvoiced cost, when compared to the longer Loko-Oweto Bridge, will toll it to recover the cost of construction from us plus profit over a period of 30 years plus .
Myself and other Bridge users will pay for the cost of this Bridge plus margin, via tolling, despite the fact that it was done with part of the oil revenue from my Imo state and our taxes.
Please next time, as a southern Nigerian ( from SW, SS and SE,) before you post the picture of the uncompleted Second Niger Bridge and ask us to dobale before Buhari, take a good look at the picture of this LOKO OWETE Bridge , stare into the mirror, look at the person staring back at you…do you know who he is?
YOU ARE STARING AT ONYE IBERIBERISM JIRI AKPA BEANS KWAA COAT.. OZU EZHI😡
AND WE SAY IT’S ONE NIGERIA?

The first picture is the original design of the second Niger bridge which included a rail line and maximum height that will enable ship access Onitsha medium Port at the cost of 117bn until Buhari APC led federal government changed the design, and came up with the second picture, by*
1. Removing the rail line,
2. Reducing height,
3. Price went up to N400bn
4. Monetized tollgate, through which South easterners will pay back the money spent on it,
whereas the same APC led federal government constructed a railway line to Niger republic for free.
Recently, the same APC government gave same Niger republic over 10 exotic jeeps worth over N1.45 billion, which the spokesperson of the said country claimed that its a way of rewarding them for assisting Nigeria to kill the same south easterners during war.
COMMENT: The IGBOS have not been fairly and justly treated in this contraption called Nigeria. – Ayo Dada.
LATEST POSTS
- Nigerian asylum seeker is stabbed to death in ‘barbaric’ attack just off Dublin’s main shopping street – as concerns over knife crime in capital spread
- New Lagos Speaker ‘Under Pressure’ To Resign As Lawmakers Protest DSS Invasion
- USAID: Ndume urges probe of B’Haram funding
- NNPC Says The Video Claiming Dangote Refinery’s Petrol Lasts Longer Is “Misleading,” Vows To Take Legal Action
- Donald Trump’s takeover of the Kennedy Center implodes in humiliating fashion

SUBSCRIBE TO OUR NEWSLETTER NOW
TEXT AD: To advertise here – Email ad@matazarising.com